{"id":3794,"date":"2022-12-16T11:50:25","date_gmt":"2022-12-16T03:50:25","guid":{"rendered":"https:\/\/xin.dazenelevator.com\/?post_type=project&p=3794"},"modified":"2023-02-08T13:29:09","modified_gmt":"2023-02-08T05:29:09","slug":"4-office-elevator-ordered-by-abidjan-customer","status":"publish","type":"project","link":"https:\/\/dazenelevator.com\/ar\/4-office-elevator-ordered-by-abidjan-customer\/","title":{"rendered":"4 Office Elevators Ordered By C\u00f4te d’Ivoire Customer"},"content":{"rendered":"
Our customer is a multinational corporation in C\u00f4te d’Ivoire. They have subsidiaries in many countries in Asia, Africa, etc. They established a connection with us in Oct 2021 and were looking for 4 x 4-floor passenger elevators. What they treasure most are the quality, design, installation, and safety of the lifts. After comparing our solution and service with some other professional suppliers, they appreciate our effort and strong support and choose to work with us finally.<\/p>\n\n\n\n
Project Location<\/strong><\/td>Abidjan, C\u00f4te d’Ivoire<\/td><\/tr> | Product<\/strong><\/td> | 4 Office Elevators<\/td><\/tr> | Project Type<\/strong><\/td> | Office Building<\/td><\/tr> | Shipping<\/strong><\/td> | We ship total 1\u00d740HQ<\/td><\/tr> | Project Time<\/strong><\/td> | Feb 2022<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n | <\/div>\n\n\n\n For This Project, Our Customer\u2019s Requirements Include:<\/h2>\n\n\n\n\u25cf 4 passenger elevators<\/p>\n\n\n\n \u25cf Top quality<\/p>\n\n\n\n \u25cf Machine roomless (MRL)<\/p>\n\n\n\n \u25cf Big cabin<\/p>\n\n\n\n \u25cf Modern decoration<\/p>\n\n\n\n \u25cf Installation team<\/p>\n\n\n\n <\/div>\n\n\n\n Our Solution<\/h2>\n\n\n\nIn this project, the shaft size is not big enough, but customer wants a big cabin. After evaluation, we upgrade the structure to make the big cabin and ensure safety. <\/div>\n\n\n\n Quality Testing Before Shipping<\/h2>\n\n\n\n |