{"id":7339,"date":"2023-08-07T14:21:35","date_gmt":"2023-08-07T06:21:35","guid":{"rendered":"https:\/\/dazenelevator.com\/?post_type=project&p=7339"},"modified":"2024-08-27T14:18:31","modified_gmt":"2024-08-27T06:18:31","slug":"fuji-brand-passenger-elevator-shipped-to-rwanda","status":"publish","type":"project","link":"https:\/\/dazenelevator.com\/ar\/fuji-brand-passenger-elevator-shipped-to-rwanda\/","title":{"rendered":"FUJI Brand Passenger Elevator Shipped to Rwanda"},"content":{"rendered":"\n
\"\"<\/figure>\n\n\n\n

Our customer is a charitable institute, introduced to us by one of our long-term business partners.
Their project is beautiful and meaningful. The elevator they need should be of good, stable quality, and economical.
They choose us due to our previous successful projects and good after-service in Rwanda.
It’s an honor that our elevator can serve such a charity.<\/p>\n\n\n\n

<\/div>\n\n\n\n
\n
Project Location<\/strong><\/td>Kigali, Rwanda<\/td><\/tr>
Product<\/strong><\/td>1 passenger elevator<\/td><\/tr>
Project Type<\/strong><\/td>School<\/td><\/tr>
Shipping<\/strong><\/td>LCL delivery in August 2023<\/td><\/tr>
Project Time<\/strong><\/td>June 2023<\/td><\/tr><\/tbody><\/table><\/figure>\n<\/div><\/div>\n\n\n\n
<\/div>\n\n\n\n

For This Project, The Customer\u2019s Requirements Include:<\/h2>\n\n\n\n
    \n
  • 1 Set passenger elevator for school<\/li>\n\n\n\n
  • Top quality<\/li>\n\n\n\n
  • Programming control system<\/li>\n\n\n\n
  • ODM for FUJI brand<\/li>\n\n\n\n
  • Installation training<\/li>\n\n\n\n
  • Booking container<\/li>\n\n\n\n
  • Quick delivery<\/li>\n<\/ul>\n\n\n\n
    <\/div>\n\n\n\n

    Our Solution<\/h2>\n\n\n\n

    We OEM for many famous brands, and our main components are the same as that of Kone, Otis.
    That means we provide the top quality elevator at a better price.
    Our business partner in Rwanda can also help with the installation, eliminating their worries.
    Instead of FCL loading, we choose LCL for this shipment to save certain shipping costs for the customer.
    Due to that the building has been built, they plan to install the elevator in October.
    We have tried to shorten the delivery time and successfully sent the elevator in early August so they can receive it before October.<\/p>\n\n\n\n

    <\/div>\n\n\n\n

    Elevator Operating<\/h2>\n\n\n\n
    \n