Dazen

+8615189717159

Elevator Modernization For A University In Chile

Compartir este

We are excited to announce that we have completed an elevator modernization project for a university in Chile!

Our dedicated team completely upgraded the elevator traction machine, control system, COP, LOP, disabled operation panel, car door, and landing door. These improvements have significantly boosted the elevator’s safety and efficiency.

We are honored to contribute to this iconic school.

Localización del proyectoChile
Proyecto750kg 7 Floor Elevator Modernization
Elevator BrandOld Otis Selectron
Modernization productosTraction machine, Control system, COP, LOP, Disabled Operation Panel, Car door, and Landing door
Tiempo del proyectoDec 2023

For This Project, Our Modernization Includes:

  1. Replacing the control system with the state-of-the-art Monarch controller
  2. Replacing a new Torindrive traction machine
  3. Customizing the COP with the customer’s logo
  4. Adding a disabled operation panel (the disabled operation panel and COP were installed on the same side as the customer’s request)
  5. Replacing all car doors and landing doors with brand-new ones

Modernization Completed

Our Test Before Delivery

Dazen Elevator Modernization for all brands, Contact us for a solution!

Obtenga una cotización instantánea para su proyecto

Póngase en contacto ahora

Póngase en contacto ahora

Envíe su consulta ahora

A quién servimos表单

Pida Cotización Ahora

Pida Cotización Ahora
Envíe su consulta