Дазен

Elevator Modernization For A University In Chile

Поделись этим

We are excited to announce that we have completed an elevator modernization project for a university in Chile!

Our dedicated team completely upgraded the elevator traction machine, control system, COP, LOP, disabled operation panel, car door, and landing door. These improvements have significantly boosted the elevator’s safety and efficiency.

We are honored to contribute to this iconic school.

Расположение проектаChile
Проект750kg 7 Floor Elevator Modernization
Elevator BrandOld Otis Selectron
Modernization ПродуктыTraction machine, Control system, COP, LOP, Disabled Operation Panel, Car door, and Landing door
Время проектаDec 2023

For This Project, Our Modernization Includes:

  1. Replacing the control system with the state-of-the-art Monarch controller
  2. Replacing a new Torindrive traction machine
  3. Customizing the COP with the customer’s logo
  4. Adding a disabled operation panel (the disabled operation panel and COP were installed on the same side as the customer’s request)
  5. Replacing all car doors and landing doors with brand-new ones

Modernization Completed

Our Test Before Delivery

Dazen Elevator Modernization for all brands, Contact us for a solution!

Получите мгновенное предложение для вашего проекта

Свяжитесь сейчас

Свяжитесь сейчас

Отправьте запрос сейчас

Кого мы обслуживаем?

Спросите цену сейчас

Спросите цену сейчас
Отправить ваш запрос