dazen

Elevator Modernization For A University In Chile

Compartilhar isso

We are excited to announce that we have completed an elevator modernization project for a university in Chile!

Our dedicated team completely upgraded the elevator traction machine, control system, COP, LOP, disabled operation panel, car door, and landing door. These improvements have significantly boosted the elevator’s safety and efficiency.

We are honored to contribute to this iconic school.

Localização do projetoChile
Projeto750kg 7 Floor Elevator Modernization
Elevator BrandOld Otis Selectron
Modernização ProdutosTraction machine, Control system, COP, LOP, Disabled Operation Panel, Car door, and Landing door
Tempo do ProjetoDec 2023

For This Project, Our Modernization Includes:

  1. Replacing the control system with the state-of-the-art Monarch controller
  2. Replacing a new Torindrive traction machine
  3. Customizing the COP with the customer’s logo
  4. Adding a disabled operation panel (the disabled operation panel and COP were installed on the same side as the customer’s request)
  5. Replacing all car doors and landing doors with brand-new ones

Modernization Completed

Our Test Before Delivery

Dazen Elevator Modernization for all brands, Contact us for a solution!

Obtenha um orçamento instantâneo para o seu projeto

Entre em contato agora

Entre em contato agora

Envie sua pergunta agora

Quem atendemos

Peça uma cotação agora

Peça uma cotação agora
Envie sua pergunta